Prepare for and complete the Goldreef CV-07 belt splice
You are the second technician on a two-person site splicing crew.
What has happened
Conveyor CV-07 at Goldreef Mining Services, a 1,200 millimetre four ply fabric belt, needs a hot vulcanised step splice on Tuesday under job card JC-26-3320. The crew leader wants you to prepare the job: the splice and step lengths from the splice table, the kit, cement and press, the Job Safety Analysis and the customer's isolation and permit arrangements. One cement lot is quarantined and must not be used. Two weeks ago at the same site the customer's isolation was found on the wrong drive and the crew leader caught it at the isolation test. A warranty repair on another splice traced to an edge that was not fully cured is also fresh in everyone's mind.
Deliverables
- Pre-work conditions checklist
- Splice geometry calculation and marking-out plan
- Kit list with cement lot check
- Completed Job Safety Analysis Form
- Splice record, job card and chemical reconciliation
Documents to use
Systems to use
Production Job Cards
Tracks every production, trial and site service job from release through setup, first-off approval, running, inspection and packing.
Raw Materials and Compounds Stock
Keeps the stock record for resins, masterbatch, copper rod, rubber ingredients, compounds and chemicals with lot numbers, quantities and locations.
WHS Incident and Hazard Register
Records injuries, near misses, hazards, chemical events, burns and property damage at all sites and on customer sites with investigation and actions.
Quality Nonconformance Register
Records nonconforming product, process deviations, cable test failures and customer complaints with disposition and corrective action.
Units of competency
Current on training.gov.au for the Plastics, Rubber and Cablemaking as at 10 September 2026.
PMBPROD377ESplice fabric ply conveyor beltsPMBPROD265EOperate portable vulcanising equipmentPMBPROD367ERemove and replace conveyor beltsPMBPROD369ERepair conveyor belt coversQualifications
PMB30121Certificate III in Polymer ProcessingWhat to look for
Evidence guide
The isolation verification before personal locks is the critical evidence and must include the drive test and belt clamps. Look for splice geometry calculated from the table, the quarantined cement lot excluded, a Job Safety Analysis that covers solvents and the hot press, and cure parameters taken from the compound data sheet with the cool-down rule stated. Records must reconcile with the stock and chemical registers.